Verify before you start
Section titled “Verify before you start”Verify that you have this before you start. In doubt? Something missing? The FIT (yellow sweater) building coordinator is there to help!
You need this per stand.
| OK | What | Where does it come from |
|---|---|---|
| 1 table | Carts | |
| 2 chairs | Carts | |
| 1/2 table cloth (in practice, 1 per 2 stands) | RentEvent box | |
| 1 3 or 4-outlet power brick | Building box | |
| Stand name | Stand Signage folder in Building box | |
| Stand guidelines | Stand Signage folder in Building box | |
| Stand floor plan | Building coordinator |
During build-up
Section titled “During build-up”Make sure this is done for every stand.
| OK | What |
|---|---|
| Table with table cloth placed as on the plan (important for fire safety). | |
| 2 chairs per stand. | |
| 1 power brick connected to power distribution power brick/box. | |
| Sign with stand name on table. | |
| Stand guidelines on table. |
During clean-up
Section titled “During clean-up”Make sure this is done for every stand.
| OK | What |
|---|---|
| Chairs stacked on the carts. | |
| Tables stacked on the carts. | |
| Table cloth in the box. | |
| All litter put in the garbage bin. | |
| Stand area swept. | |
| All other FOSDEM equipment removed and in the correct folder / box (see label) / garbage. |