Devroom build-up checklist
Verify before you start
Section titled “Verify before you start”Verify that you have this before you start. In doubt? Something missing? The FIT (yellow sweater) building coordinator is there to help!
| OK | What | Where does it come from |
|---|---|---|
| Building signage folder | Building box |
During build-up
Section titled “During build-up”Make sure this is done for every room.
We don’t or can’t go inside the room (they are locked).
| OK | What |
|---|---|
| Room name (for Saturday) attached with paper tape to the door (outside). | |
| Room schedule (for Saturday) attached with paper tape to the door (outside). | |
| Open/Close sign attached with gaffer tape (black) to the door (outside). See picture below. | |
| Matrix QR code attached with paper tape to the door (outside). |
How to attache the Open/Close sign
Section titled “How to attache the Open/Close sign”- Attach the sign with the Open or There are still seats available. side visible.
- Put the tape on top, not over the edges.
- Flip the sign and add some extra tape to the bottom, so it flips easily.


During clean-up
Section titled “During clean-up”Make sure this is done for every room.
| OK | What |
|---|---|
| Garbage bins emptied and new bags put in. | |
| All litter put in the garbage bin. | |
| Room swept. | |
| Devroom instructions folder in the box that is on the label. | |
| Open/Close sign in the building signage folder. | |
| All other FOSDEM equipment (except video and network - do not touch those) removed and in the correct folder / box (see label) / garbage. |